| Jobs name and costs |
price, som |
| 1. Rig-down operations |
|
|
| Walls (partitions) dismantling, made of brick (1/4,1/2) and slag stone |
square meter |
265 |
| Dismantling of the existing reinforced concrete constructions |
cubic meter |
2040 |
| Dismantling of the existing bricks constructions |
cubic meter |
1020 |
| Walls (partitions) dismantling, made of gypsum |
square meter |
190 |
| Door units dismantling |
unit |
255 |
| Window units dismantling |
unit |
510 |
| Tile dismantling (floor, walls) |
square meter |
75 |
| Parquet dismantling |
square meter |
65 |
| Linoleum flooring dismantling |
square meter |
45 |
| Plaster covering dismantling |
square meter |
from 75 |
| Cleaning of old paint (walls) |
square meter |
75 |
| Cleaning of old paint (ceiling) |
square meter |
80 |
| Cleaning of old wallpaper |
square meter |
55 |
| Mixer tap dismantling |
piece |
125 |
| Toilet sink/bidet dismantling |
piece |
380 |
| Washstand dismantling |
piece |
255 |
| Bath dismantling |
piece |
510 |
| Radiator dismantling |
piece |
380 |
| Electric box connection |
piece |
315 |
| |
|
|
| 2.Civil and erection works |
|
|
| Hole punching in the concrete walls |
square meter |
5355 |
| Aperture strengthening by metal shape |
running meter |
1145 |
| Dampproofing of floor by mastic |
square meter |
90 |
| Dampproofing of floor by roll materials on bituminous mastic (2 layers) |
square meter |
165 |
| Self-aligning floor strainer instalation |
square meter |
from 190 |
| Floor strainer instalation to 50 mm |
square meter |
from 255 |
| "Dry floor" instalation (Avant-garde Cnauf - 10mm) |
square meter |
305 |
| Reinforcement of floor strainer |
square meter |
115 |
| Partition of 1/2 brick |
square meter |
355 |
| Partition of 1 brick |
square meter |
405 |
| Partition of slag stone |
square meter |
280 |
| Gypsum plasterboard wall (1 layer) |
square meter |
355 |
| Gypsum plasterboard wall (2 layers) |
square meter |
405 |
| Wall facing by gypsum plasterboard (1 layer) |
square meter |
280 |
| Wall facing by gypsum plasterboard on glue |
square meter |
215 |
| Walls heat and sound proofing |
square meter |
65 |
| Walls waterproofing (depend on humidity in the room) |
square meter |
from 115 tо 330 |
| Wall reinforcement by lath |
square meter |
115 |
| Wall plastering |
square meter |
from 290 |
| Ceiling plastering |
square meter |
from 330 |
| Wall plastering for tile |
square meter |
from 255 |
| Aperture plastering (esconson) |
running meter |
from 255 |
| Wall facing by gypsum plasterboard (2 layers) |
square meter |
330 |
| |
|
|
| 3.Finishing work |
|
|
| 3.1Ceiling |
|
|
| Furring hung ceiling |
square meter |
320 |
| Armstrong hung ceiling |
square meter |
215 |
| Gypsum plasterboard hung ceiling (1 layer) |
square meter |
255 |
| Installation of different level ceiling with rectilinear elements |
square meter |
765 |
| Installation of different level ceiling from complex geometry with curvilinear elements |
square meter |
1020 |
| Structural covering |
square meter |
305 |
| Ceiling priming |
square meter |
60 |
| Ceiling coating |
square meter |
185 |
| Ceiling painting |
square meter |
130 |
| putting of decorative drop apron (fillet) |
running meter |
140 |
| coating and painting of decorative drop apron (fillet) |
running meter |
90 |
| Glueing of ceiling by Stroby net/gossamer |
square meter |
90 |
| Gypsum plasterboard hung ceiling (2 layers) |
square meter |
405 |
| |
|
|
| 3.2 Walls |
|
|
| Glueing of walls by Stroby net/gossamer |
square meter |
65 |
| Coating of gypsum plasterboard |
square meter |
115 |
| Coating of walls |
square meter |
175 |
| Wall priming (include every step) |
square meter |
55 |
| Hand wall-paper (without matching of picture) |
square meter |
165 |
| Hand wall-paper (with matching of picture) |
square meter |
215 |
| Hand wall-paper for painting |
square meter |
130 |
| Wall painting on wall-paper |
square meter |
105 |
| Wall painting on coating |
running meter |
130 |
| Base coating of esconsons |
running meter |
45 |
| Coating of esconsons (width to 400 mm) |
running meter |
130 |
| Paiting of esconsons |
running meter |
90 |
| Installation of painting corners |
running meter |
65 |
| Installation of panel esconsons |
running meter |
255 |
| Installation of wall panels |
square meter |
355 |
| |
|
|
| 3.3 Tilting |
|
|
| Wall lining by ceramic tile |
square meter |
665 |
| Wall lining by ceramic tile on gypsum plasterboard |
square meter |
560 |
| Esconson, attached column linning by ceramic tile |
square meter |
510 |
| Floor lining by ceramic tile |
square meter |
610 |
| Ceramic tile holing |
unit |
35 |
| Seam smoothing-out |
square meter |
35 |
| Installation of bath decorative screen |
unit |
1530 |
| Installation of ceramic border, plinth |
running meter |
370 |
| Making revision on magnetic holder |
unit |
635 |
| Rooms corner handling by scrids, fillet |
running meter |
65 |
| Mosaic |
square meter |
from 890 |
| |
|
|
| 3.4 Floor |
|
|
| Floors strainer to 50mm |
square meter |
from 305 |
| Plywood flooring under linoleum, parquet |
square meter |
165 |
| Floor installation by commercial linoleum |
square meter |
230 |
| Floor installation by commercial linoleum with picture making |
square meter |
from 305 |
| Floor installation by linoleum and carpeting |
square meter |
215 |
| Padding under laminated flooring board, fabricated wood block flooring |
square meter |
20 |
| Floor installation by laminated flooring board on glue |
square meter |
240 |
| Floor installation by laminated flooring board with lock |
square meter |
215 |
| Floor installation by fabricated wood block flooring |
square meter |
265 |
| Floor installation by parquetry (depend on way and kind of laying from 1.4 to 1.8) |
square meter |
from 420 |
| Floor installation by artistic parquet |
square meter |
from 665 |
| Parquet scraping |
square meter |
from 215 |
| Parquet coating |
square meter |
from 115 |
| Floor lacquering |
square meter |
from 115 |
| Floor heat and sound proofing (one-layer) |
square meter |
90 |
| Floor installation by tile |
square meter |
10 |
| Seams smoothing-out |
square meter |
1 |
| Floor moulding painting |
running meter |
70 |
| Installation of floor moulding on glue |
running meter |
90 |
| Installation of floor moulding on concrete base |
running meter |
140 |
| Installation of floor moulding on wood base |
running meter |
115 |
| Floor installation by tile |
square meter |
380 |
| |
|
|
| 4.Joinery |
|
|
| Sash pulley installation (standard) |
unit |
1785 |
| Windowsill installation |
unit |
765 |
| Door installation |
unit |
1145 |
| Hinge plate (with loop cutting) |
unit |
635 |
| Lock installation |
unit |
380 |
| Accessory installation |
unit |
65 |
| Arch installation (standard) |
unit |
1145 |
| Case installation |
running meter |
90 |
| Decorative threshold installation |
unit |
155 |
| Floor stop installation |
unit |
100 |
| |
|
|
| 5.Sanitaryware job |
|
|
| Wash basin installation and connection |
unit |
1145 |
| Wash basin installation and connection with furniture |
unit |
1785 |
| Toilet sink/bidet installation and connection |
unit |
1400 |
| Bath installation and connection without hydro-massage |
unit |
1000 |
| Bath installation and connection with hydro-massage |
unit |
1200-1500 |
| Washer installation and connection |
unit |
890 |
| Mixer tap installation and connection |
unit |
635 |
| water heater installation and connection |
unit |
1000 |
| Towel dryer installation and connection |
unit |
1275 |
| Prefilter installation and connection |
unit |
165 |
| Fine filter installation and connection |
unit |
765 |
| Reducer installation and connection |
unit |
395 |
| Lock valves installation |
unit |
165 |
| Open piping (1/2-3/4) replacement |
running meter |
265 |
| Open piping PVC (40-100 mm) replacement |
running meter |
370 |
| Open piping (1/2-3/4) installation (repoussage, polypropylene) |
running meter |
165 |
| Open piping PVC (40-100 mm) installation |
running meter |
215 |
| Link installation in concrete (for pipe ½ -3/4”) |
running meter |
125 |
| Link installation in concrete (for pipe 40-100 mm) |
running meter |
180 |
| Link installation in brick (for pipe ½ -3/4”) |
running meter |
100 |
| Link installation in brick (for pipe 40-100 mm) |
running meter |
125 |
| Electric convector installation and connection |
unit |
3825 |
| Accessory installation |
unit |
190 |
| Mirror hanging |
unit |
1020 |
| Cutting-in working water system |
unit |
1400 |
| Open piping (1/2-3/4) installation (galvanization) |
running meter |
395 |
| Installation of angle with wall mounting |
piece |
165 |
| |
|
|
| 6.Electric installation work |
|
|
| Canalization in concrete |
running meter |
125 |
| Canalization in brick |
running meter |
100 |
| Wiring in ready canal/under plastering |
running meter |
25 |
| Wiring in flute |
running meter |
45 |
| Vinylplast tubing (chutes) |
running meter |
85 |
| Manchester plate, electric box installation in concrete |
unit |
175 |
| Manchester plate, electric box installation in brick |
unit |
125 |
| Manchester plate, electric box installation in false wall |
false-wall |
100 |
| Outlet, switch installation |
point |
170 |
| Step-down transformer installation |
unit |
115 |
| Lighting fitting installation |
unit |
125 |
| Luminaire installation |
unit |
170 |
| Protective automaton installation |
unit |
190 |
| Error-protecting device installation |
unit |
240 |
| Fan installation |
unit |
215 |
| thermal floor DEVI installation (screened) |
square meter |
460 |
| Niche installation under distribution switchboard |
unit |
635 |
| Distribution switchboard installation |
unit |
1020 |
| Wiring in the electric box |
running meter |
115 |
| |
|
|
| 7.Exterior work |
|
|
| Excavation |
cubic meter |
510 |
| Monolithic work (including concrete reinforcement) |
cubic meter |
3825 |
| Curb installation |
square meter |
6 |
| Rough brickwork |
cubic meter |
1275 |
| Facial brickwork |
square meter |
405 |
| Scumblock laying |
cubic meter |
890 |
| Facade plaster |
square meter |
from 180 |
| Facade filling |
square meter |
120 |
| Facade painting on filler |
square meter |
95 |
| Roof installation by metal tile |
square meter |
230 |
| Roof installation by another goods |
square meter |
230 |
| Water course installation |
running meter |
175 |
| Landscape work (asphalt, paving flag, lawns) |
square meter |
345 |