Festivals: call for entries

Kyrgyz Serial: The contest of scripts (2024_kg)
 
Read more...
 

Call for entries: The VI Film Forum Of Women Film Directors Of Kyrgyzstan

 

Deadline: 01.03.2024

Read more...
 

XI Forum of the young cinema Umut-2024

 

Dates & place: 28.03-01.04.24, 2024, Bishkek, Kyrgyzstan
Organizer: Cinema Department with support: Interstate humanitarian cooperation fund
Participants: Ex-Soviet countries
Read more...
 
Building

Jobs name and costs  price, som
1. Rig-down operations    
Walls (partitions) dismantling, made of brick (1/4,1/2) and slag stone square meter 265
Dismantling of the existing reinforced concrete constructions  cubic meter 2040
Dismantling of the existing bricks constructions cubic meter 1020
Walls (partitions) dismantling, made of gypsum square meter 190
Door units dismantling unit 255
Window units dismantling unit 510
Tile dismantling (floor, walls) square meter 75
Parquet dismantling square meter 65
Linoleum flooring dismantling  square meter 45
Plaster covering dismantling  square meter from 75
Cleaning of old paint (walls) square meter 75
Cleaning of old paint (ceiling) square meter 80
Cleaning of old wallpaper square meter 55
Mixer tap dismantling piece 125
Toilet sink/bidet dismantling piece 380
Washstand dismantling piece 255
Bath dismantling piece 510
Radiator dismantling piece 380
Electric box connection piece 315
     
2.Civil and erection works    
Hole punching in the concrete walls square meter 5355
Aperture strengthening by metal shape running meter 1145
Dampproofing of floor by mastic square meter 90
Dampproofing of floor by roll materials on bituminous mastic (2 layers) square meter 165
Self-aligning floor strainer instalation square meter from 190
Floor strainer instalation to 50 mm square meter from 255
"Dry floor" instalation (Avant-garde Cnauf - 10mm) square meter 305
Reinforcement of floor strainer square meter 115
Partition of 1/2 brick square meter 355
Partition of 1 brick square meter 405
Partition of slag stone square meter 280
Gypsum plasterboard wall (1 layer) square meter 355
Gypsum plasterboard wall (2 layers) square meter 405
Wall facing by gypsum plasterboard (1 layer) square meter 280
Wall facing by gypsum plasterboard on glue square meter 215
Walls heat and sound proofing square meter 65
Walls waterproofing (depend on humidity in the room) square meter from 115 tо 330
Wall reinforcement by lath square meter 115
Wall plastering square meter from 290
Ceiling plastering square meter from 330
Wall plastering for tile square meter from 255
Aperture plastering (esconson) running meter from 255
Wall facing by gypsum plasterboard (2 layers) square meter 330
     
3.Finishing work    
3.1Ceiling    
Furring hung ceiling square meter 320
Armstrong hung ceiling square meter 215
Gypsum plasterboard hung ceiling (1 layer) square meter 255
Installation of different level ceiling with rectilinear elements square meter 765
Installation of different level ceiling from complex geometry with curvilinear elements square meter 1020
Structural covering square meter 305
Ceiling priming square meter 60
Ceiling coating square meter 185
Ceiling painting square meter 130
putting of decorative drop apron (fillet) running meter 140
coating and painting of decorative drop apron (fillet) running meter 90
Glueing of ceiling by Stroby net/gossamer square meter 90
Gypsum plasterboard hung ceiling (2 layers) square meter 405
     
3.2 Walls    
Glueing of walls by Stroby net/gossamer square meter 65
Coating of gypsum plasterboard  square meter 115
Coating of walls square meter 175
Wall priming (include every step) square meter 55
Hand wall-paper (without matching of picture) square meter 165
Hand wall-paper (with matching of picture) square meter 215
Hand wall-paper for painting square meter 130
Wall painting on wall-paper square meter 105
Wall painting on coating running meter 130
Base coating of esconsons running meter 45
Coating of esconsons (width to 400 mm) running meter 130
Paiting of esconsons running meter 90
Installation of painting corners running meter 65
Installation of panel esconsons running meter 255
Installation of wall panels square meter 355
     
3.3 Tilting    
Wall lining by ceramic tile square meter 665
Wall lining by ceramic tile on gypsum plasterboard square meter 560
Esconson, attached column linning by ceramic tile square meter 510
Floor lining by ceramic tile square meter 610
Ceramic tile holing unit 35
Seam smoothing-out square meter 35
Installation of bath decorative screen unit 1530
Installation of ceramic border, plinth running meter 370
Making revision on magnetic holder unit 635
Rooms corner handling by scrids, fillet running meter 65
Mosaic square meter from 890
     
3.4 Floor    
Floors strainer to 50mm square meter from 305
Plywood flooring under linoleum, parquet square meter 165
Floor installation by commercial linoleum square meter 230
Floor installation by commercial linoleum with picture making square meter from 305
Floor installation by linoleum and carpeting square meter 215
Padding under laminated flooring board, fabricated wood block flooring square meter 20
Floor installation by laminated flooring board on glue square meter 240
Floor installation by laminated flooring board with lock square meter 215
Floor installation by fabricated wood block flooring square meter 265
Floor installation by parquetry (depend on way and kind of laying from 1.4 to 1.8) square meter from 420
Floor installation by artistic parquet square meter from 665
Parquet scraping square meter from 215
Parquet coating square meter from 115
Floor lacquering square meter from 115
Floor heat and sound proofing (one-layer) square meter 90
Floor installation by tile square meter 10
Seams smoothing-out square meter 1
Floor moulding painting running meter 70
Installation of floor moulding on glue running meter 90
Installation of floor moulding on concrete base running meter 140
Installation of floor moulding on wood base running meter 115
Floor installation by tile square meter 380
     
4.Joinery    
Sash pulley installation (standard) unit 1785
Windowsill installation unit 765
Door installation unit 1145
Hinge plate (with loop cutting) unit 635
Lock installation unit 380
Accessory installation unit 65
Arch installation (standard) unit 1145
Case installation running meter 90
Decorative threshold installation unit 155
Floor stop installation unit 100
     
5.Sanitaryware job    
Wash basin installation and connection unit 1145
Wash basin installation and connection with furniture unit 1785
Toilet sink/bidet installation and connection unit 1400
Bath installation and connection without hydro-massage unit 1000
Bath installation and connection with hydro-massage unit 1200-1500
Washer installation and connection unit 890
Mixer tap installation and connection unit 635
water heater installation and connection unit 1000
Towel dryer installation and connection unit 1275
Prefilter installation and connection unit 165
Fine filter installation and connection unit 765
Reducer installation and connection unit 395
Lock valves installation unit 165
Open piping (1/2-3/4) replacement running meter 265
Open piping PVC (40-100 mm) replacement running meter 370
Open piping (1/2-3/4) installation (repoussage, polypropylene) running meter 165
Open piping PVC (40-100 mm) installation  running meter 215
Link installation in concrete (for pipe ½ -3/4”) running meter 125
Link installation in concrete (for pipe 40-100 mm) running meter 180
Link installation in brick (for pipe ½ -3/4”) running meter 100
Link installation in brick (for pipe 40-100 mm) running meter 125
Electric convector installation and connection unit 3825
Accessory installation unit 190
Mirror hanging unit 1020
Cutting-in working water system unit 1400
Open piping (1/2-3/4) installation (galvanization) running meter 395
Installation of angle with wall mounting piece 165
     
6.Electric installation work    
Canalization in concrete running meter 125
Canalization in brick running meter 100
Wiring in ready canal/under plastering running meter 25
Wiring in flute running meter 45
Vinylplast tubing (chutes) running meter 85
Manchester plate, electric box installation in concrete unit 175
Manchester plate, electric box installation in brick unit 125
Manchester plate, electric box installation in false wall false-wall 100
Outlet, switch installation point 170
Step-down transformer installation unit 115
Lighting fitting installation unit 125
Luminaire installation unit 170
Protective automaton installation unit 190
Error-protecting device installation unit 240
Fan installation unit 215
thermal floor DEVI installation (screened) square meter 460
Niche installation under distribution switchboard unit 635
Distribution switchboard installation   unit 1020
Wiring in the electric box running meter 115
     
7.Exterior work    
Excavation cubic meter 510
Monolithic work (including concrete reinforcement) cubic meter 3825
Curb installation square meter 6
Rough brickwork cubic meter 1275
Facial brickwork square meter 405
Scumblock laying cubic meter 890
Facade plaster square meter from 180
Facade filling square meter 120
Facade painting on filler square meter 95
Roof installation by metal tile square meter 230
Roof installation by another goods square meter 230
Water course installation running meter 175
Landscape work (asphalt, paving flag, lawns) square meter 345